Showing 621 - 622 of 622
Persistent link: https://www.econbiz.de/10009874176
Obtaining formal quotes and engineering conceptual designs for carbon dioxide (CO{sub 2}) sequestration sites and facilities is costly and time-consuming. Frequently, when looking at potential locations, managers, engineers and scientists are confronted with multiple options, but do not have the...
Persistent link: https://www.econbiz.de/10009437426