This paper considers optimal infinite horizon stochastic production planning problems with capacity and demand to be finite state Markov chains. The existence of the optimal feedback control is shown with the aid of viscosity solutions to the dynamic programming equations. Turnpike set concepts...
Persistent link: https://www.econbiz.de/10012750264
Focuses on a study which developed a framework for forecast and decision horizons. Definition of finite and infinite horizon stochastic optimization problems for a given forecast; Description of the general framework; Conditions for the existence of a solution horizon; Development of sufficient...
Persistent link: https://www.econbiz.de/10012750265
This paper considers an infinite horizon stochastic production planning problem with the constraint that production rate must be nonnegative. It is shown that an optimal feedback solution exists for the problem. Moreover, this solution is characterized and is then compared with the solution of...
Persistent link: https://www.econbiz.de/10012746449
This paper considers an infinite horizon stochastic production planning problem with demand assumed to be a continuous-time Markov chain. The problems with control (production) and state (inventory) constraints are treated. It is shown that a unique optimal feedback solution exists, after first...
Persistent link: https://www.econbiz.de/10012746800
This paper proposes a new methodology to solve partially observed inventory problems. Generally, these problems have infinite dimensional states that are conditional distribution of the inventory level. Our methodology involves linearizing the state transitions via unnormalized probabilities. It...
Persistent link: https://www.econbiz.de/10012846527
In this paper we explore whether the incorporation of systematic time series analyses and mathematical optimization procedures in the practical planning process has the potential to improve production program decisions. The cases of four German cash crop farms are investigated over six planning...
Persistent link: https://www.econbiz.de/10014177598
We provide results for an efficient analytical valuation of partial moments of the multivariate Gaussian distribution over convex polyhedrons to aid the solution, sensitivity analysis and structural analysis of a large number of two-stage resource acquisition and allocation problems. These...
Persistent link: https://www.econbiz.de/10014184708
This paper proposes a new methodology to solve partially observed inventory problems. Generally, these problems have infinitedimensional states that are conditional distribution of the inventory level. Our methodology involves linearizing the state transitions via unnormalized probabilities. It...
Persistent link: https://www.econbiz.de/10014204176
This paper considers the dynamic lot sizing problem of H. M. Wagner and T. M. Whitin with the assumption that the total cost of n setups is a concave nondecreasing function of n. Such setup costs could arise from the worker learning in setups and/or technological improvements in setup methods....
Persistent link: https://www.econbiz.de/10014218587
We are concerned with a discrete-time undiscounted dynamic lot size model in which demand and the production setup cost are constant for an initial few periods and the holding cost of inventory is an arbitrary nondecreasing function assumed to be stationary (i.e., explicitly independent of time)...