Showing 1 - 2 of 2
Hoisting is one of the prevalent systems for ore transportation in underground mines. In feasibility studies and planning stage of underground mining projects, before selection of technical parameters for proper mine hoist, related economic parameters must be studied. In this paper, capital and...
Persistent link: https://www.econbiz.de/10009465816
Zarshuran gold deposit, with the total reserves of some 12.5 million tons of 4.18 g/ton ore, is considered to be an important gold mining project in the area. In this paper the feasibility studies of the whole project is carried out on the basis of several economic variables. Given that mining...
Persistent link: https://www.econbiz.de/10009465918