Showing 28,111 - 28,120 of 28,503
Two phases can be distinguished in academic course scheduling: In phase one lectures have to be assigned to professors, whereas in phase two the lectures have to be scheduled. Here we assume that the lectures are already assigned to professors, i.e. the first phase has been done. For the second...
Persistent link: https://www.econbiz.de/10011613738
We consider the multi-mode resource-constrained project scheduling problem. The focus is on an algorithm which is supposed to find a makespan optimal solution. This algorithm has been presented in a recent paper by Speranza and Vercellis. The correctness of the algorithm is examined. Moreover,...
Persistent link: https://www.econbiz.de/10011613739
This contribution deals with dynamic, capacitated, multi-level lot sizing and scheduling. The basic assumption is that for each item there is exactly one machine that this item can be manufactured on but no two items share a common machine. Finding an optimal solution with a greedy algorithm...
Persistent link: https://www.econbiz.de/10011613748
This contribution acquaints the reader with a model for multi-level single-machine proportional lot sizing and scheduling problems (PLSPs) that appear in the scope of short-term production planning. It is one of the first papers that deals with dynamic capacitated multi-level lot sizing and...
Persistent link: https://www.econbiz.de/10011613751
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011613753
In dem Beitrag erfolgt eine Analyse der Erreichbarkeit von Arbeitsplätzen in Schleswig-Holstein anhand verschiedener Messkonzepte. Die Untersuchung basiert auf einer Diplomarbeit, die am Institut für Regionalforschung der Christian-Albrechts-Universität zu Kiel entstanden ist. Die für die...
Persistent link: https://www.econbiz.de/10011824569
We consider a quasilinear parabolic equation with quadratic gradient terms. It arises in the modelling of an optimal portfolio which maximizes the expected utility from terminal wealth in incomplete markets consisting of risky assets and non-tradable state variables. The existence of solutions...
Persistent link: https://www.econbiz.de/10010263419
The paper develops a version of Pontryagin's maximum principle for optimal control problems with monotonicity constraints on control variables. Whereas the literature handles such constraints by imposing an assumption of piecewise smoothness on the control variable and treating the slope of this...
Persistent link: https://www.econbiz.de/10010264833
This paper analyzes the Steiner-Weber-Problem with piecewise linear or piecewise constant transportation costs. These non-differentiable cost functions are analyzed using different one-step and dynamic linearization methods, which are based on approximations via average and marginal costs. An...
Persistent link: https://www.econbiz.de/10010264939
This paper presents a linear programming approach to analyze and optimize flow lines with limited buffer capacities and stochastic processing times. The basic idea is to solve a huge but simple linear program that models an entire simulation run of a multi-stage production process in discrete...
Persistent link: https://www.econbiz.de/10010264940