Showing 1 - 2 of 2
In this study, cost evaluation Methodology that can be used in the BIM environment, which is a 3D architectural design tool, were established. Also, a design method of a database that can efficiently manage lifecycle cost information of BIM objects was presented. The LCC analysis model presented...
Persistent link: https://www.econbiz.de/10012831111
The work plan and execution of construction site schedule are usually repetitively revised on a weekly basis. Weekly planning and execution are based on daily work progress. However, the daily work report of the site only records the construction plan and execution details on a day and is not...
Persistent link: https://www.econbiz.de/10014097875