Showing 1 - 10 of 758
Persistent link: https://www.econbiz.de/10003715681
Persistent link: https://www.econbiz.de/10007918867
Persistent link: https://www.econbiz.de/10003472039
We study a supply planning problem in a manufacturing system with two stages. The first stage is a remanufacturer that supplies two closely-related components to the second (manufacturing) stage, which uses each component as the basis for its respective product. The used products are recovered...
Persistent link: https://www.econbiz.de/10013055162
Flexible robotic cells combine the capabilities of robotic flow shops with those of flexible manufacturing systems. In an m-machine flexible cell, each part visits each machine in the same order. However, the m operations can be performed in any order, and each machine can be configured to...
Persistent link: https://www.econbiz.de/10012707633
New currency recirculation guidelines implemented by the Federal Reserve System (Fed) of the United States are intended to reduce the overuse of its currency processing services by depository institutions (banks). These changes are expected to have a significant impact on operating policies at...
Persistent link: https://www.econbiz.de/10009218741
Persistent link: https://www.econbiz.de/10009866169
Persistent link: https://www.econbiz.de/10009819506
A great deal of work has been done to analyze the problem of robot move sequencing and part scheduling in robotic flowshop cells. We examine the recent developments in this literature. A robotic flowshop cell consists of a number of processing stages served by one or more robots. Each stage has...
Persistent link: https://www.econbiz.de/10014218350
This paper considers the problem of scheduling operations in bufferless robotic cells that produce identical parts. Finding a cyclic solution that minimizes the long-run average time to produce a part has long been a fundamental open problem. Most research has been focused on finding an optimal...
Persistent link: https://www.econbiz.de/10014138523