Showing 41 - 50 of 802,103
Persistent link: https://www.econbiz.de/10009373804
Persistent link: https://www.econbiz.de/10010255126
Persistent link: https://www.econbiz.de/10009772773
Persistent link: https://www.econbiz.de/10010385629
In this paper, I conduct one of the first evaluations of a voluntary management program that features an independent verification mechanism to determine whether it is achieving its ultimate objectives. Using a sample of thousands of manufacturing facilities across the United States, I find...
Persistent link: https://www.econbiz.de/10014027542
This study investigates the role pre-existing personal connections play in a crucial element of the supply chain – supplier selection. We find that the likelihood that a potential supplier (hereafter, a vendor) is selected to be an actual supplier (hereafter, supplier) increases when personal...
Persistent link: https://www.econbiz.de/10012853971
This paper is concerned with confidentiality of vertical information sharing in a supply chain consisting of one manufacturer in the upstream and two or more retailers in the downstream engaging in a Bertrand competition. Each retailer has some private information about the uncertain demand and...
Persistent link: https://www.econbiz.de/10014028169
This paper examines the effect of information sharing on supply chain configuration where the market characterized by demand uncertainty. A dynamic multi-stage game theoretic model with incomplete information is employed to capture the sequence of events. Our supply chain consists of two...
Persistent link: https://www.econbiz.de/10011109348
In this paper, we develop a supply chain/logistics network model for critical needs in the case of disruptions. The objective is to minimize the total network costs, which are generalized costs that may include the monetary, risk, time, and social costs. The model assumes that disruptions may...
Persistent link: https://www.econbiz.de/10014187749
We consider a two-stage serial supply chain with capacity limits, where each installation is operated by managers attempting to minimize their own costs. A multiple-period model is necessitated by the multiple stages, capacity limits, stochastic demand, and the explicit consideration of...
Persistent link: https://www.econbiz.de/10014040384