This paper presents new formulations for multi-activity shift scheduling problems (MASSP). In these formulations, the rules governing the feasibility of shifts are encoded in state-expanded networks in which nodes are associated with states and arcs represent assignments inducing state...
Persistent link: https://www.econbiz.de/10013235558
Combinatorial optimization problems are usually NP-hard and the solution space of them is very large. Therefore the set of feasible solutions cannot be evaluated one by one. Artificial Bee Colony (ABC), Particle Swarm Optimization (PSO) and Genetic Algorithms (GA) are metaheuristic techniques...
Persistent link: https://www.econbiz.de/10013060468
This note formulates an assignment problem for obtaining optimal level schedules for mixed-model assembly lines in JIT production systems. The problem was formulated as a quadratic integer programming problem in a recent paper by Miltenburg (1989) where, however, only enumerative algorithms and...
Persistent link: https://www.econbiz.de/10012746783
A heuristic procedure is developed for minimizing makespan in flow-shop scheduling problems. In comparison with current algorithms, our algorithm seems to result in an improved makespan with a small additional computational effort. An algorithm is also developed to minimize the required number...
Persistent link: https://www.econbiz.de/10012746785
A companion paper (Part I) considers the problem of minimizing the weighted earliness and tardiness of jobs scheduled on a single machine around a common due date, d, which is unrestrictively late. This paper (Part II) considers the problem of minimizing the unweighted earliness and tardiness of...
Persistent link: https://www.econbiz.de/10012746786
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011655297
Specific scheduling problems with complex hybrid logical and terminal constraints, non-stationarity in process execution as well as complex interrelations between dynamics in process design, capacity utilization, and machine setups require further investigation and the application of a broad...
Persistent link: https://www.econbiz.de/10012846529
A job-shop with two machine centers with the second one consisting of k parallel machines is considered. An approximate algorithm for minimizing schedule length in the job shop with unit time operations in the first machine center and k time-units operations in the second is proposed. The...
Persistent link: https://www.econbiz.de/10014191821
We consider the problem of scheduling n jobs in a pallet-constrained two-machine flowshop so as to minimize the makespan. In such a flowshop environment, each job needs a pallet the entire time, from the start of its first operation until the completion of the last operation, and the number of...
Persistent link: https://www.econbiz.de/10014211244
We study the problem of scheduling a chain-reentrant shop, in which each job goes for its processing first to a machine called the primary machine, then to a number of other machines in a fixed sequence, and finally back to the primary machine for its last operation. The problem is to schedule...