Showing 81 - 90 of 644,834
In this paper, we consider demand management decisions for an assemble-to-order production system in which both the availability of intermediate material and assembly capacity are limited. For each incoming order, the manufacturer must decide whether to accept it and what due date to quote for...
Persistent link: https://www.econbiz.de/10014037760
A single-machine multiproduct manufacturing system with random breakdowns and random repair times is considered. Under a weak capacity condition on the system it is shown that the total work-in-progress (WIP) is a recurrent stochastic process. By replacing the stochastic model by a deterministic...
Persistent link: https://www.econbiz.de/10012746440
A single machine processing different types of parts is considered. Switching from one type to another involves a setup time. The part types may have different processing times. The resulting scheduling problem is treated as a dynamical system for which several feedback policies that are...
Persistent link: https://www.econbiz.de/10012746791
This work aims at investigating the influence of picking batch size to average time in system of orders in a one-aisle warehouse under the assumption that order arrivals follow a Poisson process and items are uniformly distributed over the aisle's length. We model this problem as an M/G[k]/1...
Persistent link: https://www.econbiz.de/10014031463
Persistent link: https://www.econbiz.de/10000842083
Persistent link: https://www.econbiz.de/10000635787
Persistent link: https://www.econbiz.de/10003713071
Persistent link: https://www.econbiz.de/10003717903
Persistent link: https://www.econbiz.de/10003756431
Persistent link: https://www.econbiz.de/10003768594