Showing 1 - 10 of 14,225
In projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally...
Persistent link: https://www.econbiz.de/10010294420
By using the methods of multi-criteria analysis it is possible to make decisions which have significant influence on companies' business. The aim of this paper is to evaluate different suppliers using the integrated model that recognizes a combination of fuzzy AHP (Analytical Hierarchy Process)...
Persistent link: https://www.econbiz.de/10011920332
Supply chain disruptions have serious consequences for society and this has made supply chain risk management (SCRM) an attractive area for researchers and managers. In this paper, we use an objective literature mapping approach to identify, classify, and analyze decision-making models and...
Persistent link: https://www.econbiz.de/10014525569
Long-term throughput, as a key performance indicator of a stochastic flow line, is affected by numerous parameters describing the features of the flow line, such as processing time and buffer size. Fast and accurate evaluation methods for a given set of values for those parameters are a...
Persistent link: https://www.econbiz.de/10014554639
This article highlights the application of the Preference Ranking Organization Method for Enrichment of Evaluations (PROMETHEE) I and II in selecting the best laptop model among six different available models in the market. Seven important criteria, that is, processor, hard disk capacity,...
Persistent link: https://www.econbiz.de/10012601097
The theory of restrictions (TOC) is a philosophy of continuous improvement, which focuses on the weakest link in the chain, to improve the performance of the production system. The purpose of the research was to determine the quantities to be made of each product and its production sequence in a...
Persistent link: https://www.econbiz.de/10014494418
We study the problem to simultaneously decide on the structures and the schedules for an entire portfolio of flexible projects. The projects are flexible as alternative technologies and procedures can be used to achieve the respective project task. The choice between different technologies and...
Persistent link: https://www.econbiz.de/10014503850
Due to the rapid growth of e-mobility, increasing amounts of lithium-ion batteries are produced and returned after their lifetime. However, these returns will lead to new challenges for manufacturers and recyclers, considering the end-of-life. Especially the increasing interaction between...
Persistent link: https://www.econbiz.de/10014504098
Persistent link: https://www.econbiz.de/10014504506
This paper calls for a change in paradigm in lot sizing and scheduling. Traditionally, a discrete time scale is chosen to model lot sizing and scheduling. As an alternative, the so-called block planning concept is proposed which is based on a continuous representation of time. A mixed-integer...
Persistent link: https://www.econbiz.de/10010435804