Showing 1 - 10 of 25
Persistent link: https://www.econbiz.de/10014391973
Persistent link: https://www.econbiz.de/10011487761
Persistent link: https://www.econbiz.de/10009685980
We consider a model for determining optimal opportunistic maintenance schedules w.r.t. a maximum replacement interval. This problem generalizes that of Dickman et al. (J Oper Res Soc India 28:165–175, <CitationRef CitationID="CR12">1991</CitationRef>) and is a natural starting point for modelling replacement schedules of more complex...</citationref>
Persistent link: https://www.econbiz.de/10010999715
We consider a model for determining optimal opportunistic maintenance schedules w.r.t. a maximum replacement interval. This problem generalizes that of Dickman et al. (J Oper Res Soc India 28:165–175, 1991 ) and is a natural starting point for modelling replacement schedules of more complex...
Persistent link: https://www.econbiz.de/10010759317
Persistent link: https://www.econbiz.de/10010055151
The multitask cell at GKN Aerospace Sweden is a flexible job shop containing ten resources aimed at being flexible with regard to product mix and processing types. We present a time-indexed formulation of the problem of optimally scheduling the planned jobs on the resources, also considering a...
Persistent link: https://www.econbiz.de/10011207816
Persistent link: https://www.econbiz.de/10010094356
Persistent link: https://www.econbiz.de/10008702146
Persistent link: https://www.econbiz.de/10010487469