Ahmad, Shabbir; Riaz, Muhammad; Abbasi, Saddam Akber; … - In: European Journal of Industrial Engineering 8 (2014) 4, pp. 478-512
Standard Shewhart control charts are often based on the assumption that the observations follow a specific parametric distribution, such as the normal, and outlier-free samples are initially selected to construct control limits for future monitoring of process parameters, e.g., location,...