Showing 3,511 - 3,520 of 3,542
Persistent link: https://www.econbiz.de/10011736342
Persistent link: https://www.econbiz.de/10012209647
Purpose: The overstocked goods flow in the hub of hub-and-spoke logistics network should be disposed of in time, to reduce delay loss and improve the utilization rate of logistics network resources. The problem we need to solve is to let logistics network cooperate by sharing network resources...
Persistent link: https://www.econbiz.de/10012122361
The stock market has always been an attractive area for researchers since no method has been found yet to predict the stock price behavior precisely. Due to its high rate of uncertainty and volatility, it carries a higher risk than any other investment area, thus the stock price behavior is...
Persistent link: https://www.econbiz.de/10011563556
Persistent link: https://www.econbiz.de/10011609672
In order to develop thermal power plants operational capabilities to face the new operational challenges of electrical power, in this paper we propose an approach to design operational procedures on a drum boiler of a thermal power plant. The proposed approach uses a coupled system of a...
Persistent link: https://www.econbiz.de/10012181019
Persistent link: https://www.econbiz.de/10011917138
Persistent link: https://www.econbiz.de/10011917154
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011942632
Persistent link: https://www.econbiz.de/10012221864