A criterion of production model selection for building material with delivery delay
Year of publication: |
2010
|
---|---|
Authors: | Cao, De-bi ; Yin, Yong ; Kaku, Ikou |
Published in: |
International journal of production research : American Institute of Industrial Engineers ; Society of Manufacturing Engineers. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 1604776. - Vol. 48.2010, 12, p. 3429-3444
|
Saved in:
Saved in favorites
Similar items by person
-
A criterion of production model selection for building material with delivery delay
Cao, De-bi, (2010)
-
A criterion of production model selection for building material with delivery delay
Cao, De-bi, (2010)
-
Modeling and numerical analysis of line-cell conversion problems
Kaku, Ikou, (2009)
- More ...