A DECOMPOSITION-BASED HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
Year of publication: |
2005-02
|
---|---|
Authors: | DEBELS, D. ; VANHOUCKE, M. |
Institutions: | Faculteit Economie en Bedrijfskunde, Universiteit Gent |
Subject: | project scheduling | genetic algorithms | decomposition |
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2013)
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2015)
-
Considering skills evolutions in multi-skilled workforce allocation with flexible working hours
Attia, El-Awady, (2014)
- More ...
-
ON THE MORPHOLOGICAL STRUCTURE OF A NETWORK
VANHOUCKE, M., (2004)
-
A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem
DEBELS, D., (2005)
-
Pre-emptive resource-constrained project scheduling with setup times
DEBELS, D., (2006)
- More ...