A GRASP approach to transporter scheduling for ship assembly block operations management
Year of publication: |
2013
|
---|---|
Authors: | Park, Changkyu ; Seo, Junyong |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 7.2013, 3, p. 312-332
|
Subject: | parallel machine scheduling | greedy randomised adaptive search procedure | GRASP | heuristics | simulation | shipbuilding | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Schiffbau | Shipbuilding industry | Theorie | Theory | Simulation | Produktionssystem | Manufacturing system | Produktionssteuerung | Production control |
-
Scheduling dynamic job shop manufacturing cells with family setup times : a simulation study
Klausnitzer, Armin, (2017)
-
Lot-sizing in a multi-stage flow line production system with energy consideration
Masmoudi, Oussama, (2017)
-
Wu, C.-C., (2013)
- More ...
-
Comparing heuristic algorithms of the planar storage location assignment problem
Park, Changkyu, (2010)
-
Ship assembly block operations management : a case study
Park, Changkyu, (2010)
-
A GRASP approach to transporter scheduling for ship assembly block operations management
Park, Changkyu, (2013)
- More ...