A mixed-integer programming-based heuristic for project scheduling with work-content constraints
Year of publication: |
2017
|
---|---|
Authors: | Zimmermann, Adrian |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 11.2017, 6, p. 752-773
|
Subject: | MIP-based heuristic | mixed-integer linear programming | project scheduling | flexible resource usage | work content | Scheduling-Verfahren | Scheduling problem | Projektmanagement | Project management | Heuristik | Heuristics | Theorie | Theory | Mathematische Optimierung | Mathematical programming |
-
Underground mine scheduling under uncertainty
Nesbitt, Peter, (2021)
-
Sprecher, Arno, (1996)
-
Sprecher, Arno, (1996)
- More ...
-
Das Projekt Gleichheitsmonitor
Soland, Rita, (2005)
-
Wirtschaftsdemokratie statt mehr Kapitalismus!
Zimmermann, Adrian, (2006)
-
Zimmermann, Adrian, (2013)
- More ...