A multi-objective integrated model for selecting, scheduling, and budgeting road construction projects
Year of publication: |
16 November 2018
|
---|---|
Authors: | Hosseininasab, Seyyed-Mohammadreza ; Shetab-Boushehri, Seyyed-Nader ; Hejazi, Seyed Reza ; Karimi, Hadi |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 271.2018, 1 (16.11.), p. 262-277
|
Subject: | Transportation | Network design | Ordered logit model | Knee point | Isfahan | Scheduling-Verfahren | Scheduling problem | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | USA | United States | Theorie | Theory |
-
Multi-objective integer programming : a general approach for generating all non-dominated solutions
Özlen, Melih, (2009)
-
A multiobjective framework for heavily constrained examination timetabling problems
Mumford, Christine L., (2010)
-
A survey of multi-objective scheduling techniques applied to the job shop problem (JSP)
Bakuli, David L., (2006)
- More ...
-
Hosseininasab, Seyyed-Mohammadreza, (2015)
-
Mahmoudi, Reza, (2019)
-
Mahmoudi, Reza, (2020)
- More ...