A new multi-objective-multi-criteria model for determining physical asset management strategy based on maintenance and procurement factors
Year of publication: |
2021
|
---|---|
Authors: | Sayyah, Ali ; Abbasi-Pooya, Amin ; Kazemzadeh, Reza Baradaran |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises, ISSN 1751-5262, ZDB-ID 2435893-9. - Vol. 15.2021, 2, p. 167-205
|
Subject: | physical asset management | PAM | maintenance planning | contract management | reliability | availability | equipment management | Management | Instandhaltung | Maintenance policy | Beschaffung | Procurement |
-
Al-Jabouri, Hamzea, (2023)
-
Performance analysis of repairable system using GA and fuzzy Lambda-Tau methodology
Kumar, Ajay, (2013)
-
Analysing maintenance strategies by FANP considering RAM criteria : a case study
Pourjavad, Ehsan, (2014)
- More ...
-
Ostadi, Bakhtiar, (2010)
-
Robust economic-statistical design of X-bar control chart
Safaei, Abdul Sattar, (2015)
-
Time-cost tradeoff analysis in project management : an ant system approch
Mokhtari, Hadi, (2011)
- More ...