A note on the integrality gap of an ILP formulation for the periodic maintenance problem
Year of publication: |
2011
|
---|---|
Authors: | Grigoriev, Alexander ; Van De Klundert, Joris |
Published in: |
Operations research letters. - Amsterdam [u.a.] : Elsevier, ISSN 0167-6377, ZDB-ID 720735-9. - Vol. 39.2011, 4, p. 252-254
|
Subject: | Theorie | Theory | Instandhaltung | Maintenance policy | Scheduling-Verfahren | Scheduling problem |
-
Maintenance policy in job-shop manufacturing systems with reminder cell
Renna, Paolo, (2016)
-
The taxiway repair schedule problem : a heuristic rule and a branch-and-bound solution
Wegner, Louis H., (1982)
-
Papadakos, Nikolaos, (2009)
- More ...
-
Modeling and solving the periodic maintenance problem
Grigoriev, Alexander, (2004)
-
Modeling and solving the periodic maintenance problem
Grigoriev, Alexander, (2003)
-
Throughput rate optimization in high multiplicity sequencing problems
Grigoriev, Alexander, (2001)
- More ...