A re-entrant hybrid flow shop scheduling problem with machine eligibility constraints
Year of publication: |
1-15 August 2018
|
---|---|
Authors: | Zhang, Xiang Yi ; Chen, Lu |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 56.2018, 16 (1/15.8.), p. 5293-5305
|
Subject: | hybrid flow shop | machine eligibility | rotor production | differential evolution | scheduling | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Produktionssteuerung | Production control | Produktionsplanung | Production planning |
-
Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping
Hasani, Ali, (2022)
-
Scheduling a tempered glass manufacturing system : a three-stage hybrid flow shop model
Liu, Ming, (2017)
-
Controlling work in process during semiconductor assembly and test operations
Zhang, Chuwen, (2017)
- More ...
-
A branch-and-cut algorithm for the vehicle routing problem with two-dimensional loading constraints
Zhang, Xiang Yi, (2021)
-
A branch-and-cut algorithm for the vehicle routing problem with two-dimensional loading constraints
Zhang, Xiang Yi, (2022)
-
Zhang, Xiang Yi, (2022)
- More ...