A rework-based dispatching algorithm for module process in TFT-LCD manufacture
Year of publication: |
2010
|
---|---|
Authors: | Shin, Hyun Joon ; Kang, Yong Ha |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 48.2010, 3/4 (1/15.2.), p. 915-931
|
Subject: | Halbleiterindustrie | Semiconductor industry | Scheduling-Verfahren | Scheduling problem | Flüssigkristallanzeige | Liquid cristal display | Algorithmus | Algorithm | Experiment |
-
The liquid crystal injection scheduling problem (LCISP)
Tai, Yu-ting, (2011)
-
Job shop scheduling with setup times, deadlines and precedence constraints
Balas, Egon, (2008)
-
Weigert, Gerald, (2009)
- More ...
-
An adaptive scheduling algorithm for a parallel machine problem with rework processes
Kang, Yong Ha, (2010)
-
Shin, Hyun Joon, (2010)
-
Study of failure detection and recovery in manufacturing grid resource service scheduling
Kang, Yong Ha, (2010)
- More ...