A Ricardian Theory of Hydroelectric Power Development: Some Canadian Evidence.
Once a hydroelectric power site is operational, its production is constrained both by the available hydraulic energy that drives the turbines and by the installed capacity that limits the pace at which hydraulic energy can be turned into electricity. Different costs are associated with these two constraints. Assuming generating equipment mix cost minimization, the optimal stacking order under the load duration curve is derived when production is stationary and when it is growing exponentially. The analysis throws some light on a fairly widespread feature of Canadian hydroelectric power development: limited hydro power. The history of hydro power site development in British Columbia, Manitoba, and Quebec displays features consistent with the analysis.
Year of publication: |
1989
|
---|---|
Authors: | Bernard, Jean-Thomas |
Published in: |
Canadian Journal of Economics. - Canadian Economics Association - CEA. - Vol. 22.1989, 2, p. 328-39
|
Publisher: |
Canadian Economics Association - CEA |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Multinational corporations, transfer prices, and taxes : evidence from the US petroleum industry
Bernard, Jean-Thomas, (1988)
-
Réglementation des prix de l'électricité à l'exportation par l'ONE
Bernard, Jean-Thomas, (1988)
-
Multinational corporations, tranfer prices, and taxes : evidence from the US petroleum industry
Bernard, Jean-Thomas, (1989)
- More ...