A solution for cyclic scheduling of multi-hoists without overlapping
Year of publication: |
2009
|
---|---|
Authors: | Zhou, Zhili ; Li, Ling |
Published in: |
Annals of operations research. - Dordrecht, The Netherlands : Springer Nature B.V., ISSN 0254-5330, ZDB-ID 252629-3. - Vol. 168.2009, p. 5-21
|
Subject: | Overlapping Generations | Overlapping generations | Scheduling-Verfahren | Scheduling problem | USA | United States | Theorie | Theory |
-
Secular stagnation? : growth, asset returns and welfare in the next decades : first results
Geppert, Christian, (2016)
-
Life in shackles? : the quantitative implications of reforming the educational loan system
Heijdra, Ben J., (2014)
-
The EU-US unemployment puzzle revisited : institutions, demography, and capital flows
Marchiori, Luca, (2017)
- More ...
-
Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines
Zhou, Zhili, (2012)
-
Liu, Jiyin, (2008)
-
The production scheduling problem in a multi-page invoice printing system
Zhang, Yan, (2010)
- More ...