A study of the multi-stage flowshop scheduling problem with alternative operation assignments
Year of publication: |
2002
|
---|---|
Authors: | Futatsuishi, Yoshihiro ; Watanabe, Ichie ; Nakanishi, Toshio |
Published in: |
Mathematics and Computers in Simulation (MATCOM). - Elsevier, ISSN 0378-4754. - Vol. 59.2002, 1, p. 73-79
|
Publisher: |
Elsevier |
Subject: | Makespan | Flowshop | Assignment | Scheduling | Sequencing |
-
Aydilek, Asiye, (2015)
-
Aydilek, Asiye, (2013)
-
Demonstrating Johnson's algorithm via resource-constrained scheduling
Cheng, T. C. E., (2017)
- More ...
-
Clock synchronization algorithm for parallel road-traffic simulation system in a wide area
Namekawa, Mitsuhiro, (1999)
-
The development of a road traffic simulation system in broad areas
Nakanishi, Toshio, (1995)
-
An evaluation of the road traffic system simulator PIMTRACS by PIM
Takahashi, Michiya, (2002)
- More ...