A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers
Year of publication: |
2009
|
---|---|
Authors: | Wang, Xianpeng ; Tang, Lixin |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 36.2009, 3, p. 907-918
|
Subject: | Stahlindustrie | Steel industry | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Algorithmus | Algorithm | Theorie | Theory |
-
Lee, Jun-ho, (2021)
-
Scheduling two identical parallel machines with preparation constraints
Labbi, Wafaa, (2017)
-
Chain-reentrant shop with an exact time lag : new results
Amrouche, Karim, (2017)
- More ...
-
Wang, Xianpeng, (2010)
-
Integration of batching and scheduling for hot rolling production in the steel industry
Wang, Xianpeng, (2008)
-
A predictive reactive scheduling method for color-coating production in steel industry
Tang, Lixin, (2008)
- More ...