Action plan for operations support of the Pehur High-Level Canal (PHLC) Project: 1 January 1995 to 31 December 2001 submitted to Irrigation Department North West Frontier Province
Year of publication: |
1997
|
---|---|
Authors: | Skogerboe, G. V. ; Habib, Z. |
Institutions: | International Water Management Institute (IWMI) |
Subject: | Irrigation canals | Operations | Maintenance | Water allocation | Performance evaluation | Simulation models | Flow control | Organizations |
-
Hydraulic simulations to evaluate and predict design and operation of the Chashma Right Bank Canal
Habib, Z., (1999)
-
Khan, A. H., (1998)
-
Skogerboe, Gaylord V., (1996)
- More ...
-
Habib, Z., (1996)
-
Skogerboe, G. V., (1997)
-
Habib, Z., (1996)
- More ...