An adaptive genetic algorithm for demand-driven and resource-constrained project scheduling in aircraft assembly
Year of publication: |
March 2017
|
---|---|
Authors: | Shan, Siqing ; Hu, Zhongjun ; Liu, Zhilian ; Shi, Jihong ; Wang, Li ; Bi, Zhuming |
Published in: |
Information technology and management. - New York, NY [u.a.] : Springer, ISSN 1385-951X, ZDB-ID 2212813-X. - Vol. 18.2017, 1, p. 41-53
|
Subject: | Demand-driven | NP-hard problems | Genetic algorithm | Resource-constrained | Project scheduling | Resource-constrained project scheduling problem (RCPSP) | Aircraft assembly | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Projektmanagement | Project management | Engpass | Bottleneck | Mathematische Optimierung | Mathematical programming | Produktionssteuerung | Production control |
-
Differential evolution for solving multi-mode resource-constrained project scheduling problems
Damak, N., (2009)
-
Scheduling of Resource-Constrained Projects
Klein, Robert, (2000)
-
Watermeyer, Kai, (2020)
- More ...
-
Developing a rapid response production system for aircraft manufacturing
Shan, Siqing, (2013)
-
Feature weighted naïve Bayes algorithm for information retrieval of enterprise systems
Wang, Li, (2014)
-
Developing a rapid response production system for aircraft manufacturing
Shan, Siqing, (2013)
- More ...