An approximation algorithm for identical parallel machine scheduling with resource dependent processing times
Year of publication: |
2008
|
---|---|
Authors: | Kellerer, Hans |
Published in: |
Operations research letters. - Amsterdam [u.a.] : Elsevier, ISSN 0167-6377, ZDB-ID 720735-9. - Vol. 36.2008, 2, p. 157-159
|
Subject: | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm |
-
A review of methods and algorithms for optimizing construction scheduling
Zhou, J., (2013)
-
Online algorithms for scheduling two parallel machines with a single server
Jiang, Yiwei, (2015)
-
An ant colonial optimisation approach for no-wait permutation flow shop scheduling
Khan, Ahitsham Shad, (2017)
- More ...
-
Grundbegriffe der statistischen Hypothesenprüfung
Kellerer, Hans, (1970)
-
Aufgaben, Ausbildung, Weiterbildung von Statistikern : Kurzreferate und Berichte
Bartels, Hildegard, (1962)
-
Statistik im modernen Wirtschafts- und Sozialleben
Kellerer, Hans, (1970)
- More ...