An integrated production and direct shipment problem in a mining industry
Year of publication: |
2022
|
---|---|
Authors: | Rakiz, Asma ; Absi, Nabil ; Fenies, Pierre |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 60.2022, 21, p. 6659-6681
|
Subject: | integrated optimisation | mining industry | Multi-level lot-sizing with direct shipment | single railway transport system | transport time windows | upstream and downstream decisions propagation | Bergbau | Mining | Lieferkette | Supply chain | Schienenverkehr | Railway transport | Losgröße | Lot size | EU-Staaten | EU countries | Tourenplanung | Vehicle routing problem | Ganzzahlige Optimierung | Integer programming |
-
A branch-and-cut algorithm for the inventory routing problem with product substitution
Mahmutoğulları, Özlem, (2023)
-
Multiple train repositioning operations in a railyard network
Aliakbari, Mina, (2022)
-
Wei, Hairui, (2024)
- More ...
-
Comparing approaches for a multi-level planning problem in a mining industry
Rakiz, Asma, (2023)
-
Blockchain in general management and economics : a systematic literature review
Alkhudary, Rami, (2020)
-
The critical success factors of the ERP system project : a meta-analysis methodology
Zouine, Abdesamad, (2014)
- More ...