An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
Year of publication: |
2012
|
---|---|
Authors: | Wu, Tao ; Shi, Leyuan ; Song, Jie |
Published in: |
Annals of operations research. - Dordrecht, The Netherlands : Springer Nature B.V., ISSN 0254-5330, ZDB-ID 252629-3. - Vol. 196.2012, p. 635-650
|
Subject: | Heuristik | Heuristics | Losgröße | Lot size | Produktionsplanung | Production planning | Theorie | Theory | Durchlaufzeit | Lead time |
-
Germs, R., (2013)
-
Flow shop batching and scheduling with sequence-dependent setup times
Shen, Liji, (2014)
-
A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Gerstl, Enrique, (2014)
- More ...
-
An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
Wu, Tao, (2012)
-
Data mining-based dispatching system for solving the local pickup and delivery problem
Chen, Weiwei, (2013)
-
Data mining-based dispatching system for solving the local pickup and delivery problem
Chen, Weiwei, (2013)
- More ...