An O(n log n) algorithm for the two-machine flow shop problem with variable machine speeds
Year of publication: |
1993
|
---|---|
Authors: | Hoesel, C. P. van ; Wagelmans, A. P. ; Vliet, Martina van |
Publisher: |
Amsterdam [u.a.] : Tinbergen Inst. |
Subject: | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Produktionssteuerung | Production control | Durchlaufzeit | Lead time | Heuristik | Heuristics |
Extent: | 12 S |
---|---|
Series: | Discussion paper / Tinbergen Institute. - Rotterdam [u.a.], ISSN 0929-0834, ZDB-ID 1336423-6. - Vol. 93-173 |
Type of publication: | Book / Working Paper |
Type of publication (narrower categories): | Arbeitspapier ; Working Paper |
Language: | English |
Source: | ECONIS - Online Catalogue of the ZBW |
-
Xu, Dehua, (2008)
-
Panwalkar, S. S., (2012)
-
Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects
Ruiz-Torres, Alex J., (2013)
- More ...
-
Polyhedral characterization of the economic lot-sizing problem with start-up costs
Hoesel, C. P. van, (1992)
-
An O(T3) algorithm for the economic lot-sizing problem with constant capacities
Hoesel, C. P. van, (1993)
-
An O(T3) algorithm for the economic lot-sizing problem with constant capacities
VanHoesel, C. P., (1993)
- More ...