Application of the NUREG/CR-6850 EPRI/NRC Fire PRA Methodology to a DOE Facility
The application NUREG/CR-6850 EPRI/NRC fire PRA methodology to DOE facility presented several challenges. This paper documents the process and discusses several insights gained during development of the fire PRA. A brief review of the tasks performed is provided with particular focus on the following: • Tasks 5 and 14: Fire-induced risk model and fire risk quantification. A key lesson learned was to begin model development and quantification as early as possible in the project using screening values and simplified modeling if necessary. • Tasks 3 and 9: Fire PRA cable selection and detailed circuit failure analysis. In retrospect, it would have been beneficial to perform the model development and quantification in 2 phases with detailed circuit analysis applied during phase 2. This would have allowed for development of a robust model and quantification earlier in the project and would have provided insights into where to focus the detailed circuit analysis efforts. • Tasks 8 and 11: Scoping fire modeling and detailed fire modeling. More focus should be placed on detailed fire modeling and less focus on scoping fire modeling. This was the approach taken for the fire PRA. • Task 14: Fire risk quantification. Typically, multiple safe shutdown (SSD) components fail during a given fire scenario. Therefore dependent failure analysis is critical to obtaining a meaningful fire risk quantification. Dependent failure analysis for the fire PRA presented several challenges which will be discussed in the full paper.
Year of publication: |
2011-07-21
|
---|---|
Authors: | Tom Elicson ; Bentley Harwood ; Richard Yorg ; Heather Lucek ; Jim Bouchard ; Ray Jukkola ; Duan Phan |
Subject: | specific nuclear reactors and associated plants | CABLES | PROBABILISTIC ESTIMATION | RISK ASSESSMENT | SHUTDOWN | SIMULATION |
Saved in:
freely available
Saved in favorites
Similar items by subject
-
Use of the Homeland-Defense Operational Planning System (HOPS) for Emergency Management
Durling, Jr., (2008)
-
Bley, Dennis C., (2009)
-
Evaluation Between Existing and Improved CCF Modeling Using the NRC SPAR Models
James K. Knudsen, (2010)
- More ...