Bi-criteria group scheduling in hybrid flowshops
Year of publication: |
2013
|
---|---|
Authors: | Bozorgirad, Mir Abbas ; Logendran, Rasaratnam |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 145.2013, 2, p. 599-612
|
Subject: | Tabu search | Group scheduling | Hybrid flowshop | Bi-criteria objective function | Sequence-dependent setup times | Mixed-integer linear programming | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Mathematische Optimierung | Mathematical programming | Theorie | Theory |
-
Behjat, Saeed, (2017)
-
Mao, Kun, (2014)
-
Wei, Qi, (2019)
- More ...
-
Bi-criteria group scheduling in hybrid flowshops
Bozorgirad, Mir Abbas, (2013)
-
Bi-criteria group scheduling in hybrid flowshops
Bozorgirad, Mir Abbas, (2013)
-
Integrated assembly line balancing with resource restrictions
Moon, Ilkyeong, (2009)
- More ...