Bi-objective optimisation model for installation scheduling in offshore wind farms
Year of publication: |
February
|
---|---|
Authors: | Irawan, Chandra Ade ; Jones, Dylan ; Ouelhadj, Djamila |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 78.2017, p. 393-407
|
Subject: | Variable Neighbourhood Search | Simulated Annealing | Multi-objectives | Compromise programming | Installation scheduling | Offshore wind farm | Windenergieanlage | Wind turbine | Scheduling-Verfahren | Scheduling problem | Offshore-Industrie | Offshore industry | Mathematische Optimierung | Mathematical programming | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Simulation |
-
Optimisation of maintenance routing and scheduling for offshore wind farms
Irawan, Chandra Ade, (2017)
-
On offshore wind farm maintenance scheduling for decision support on vessel fleet composition
Gutierrez-Alcoba, A., (2019)
-
An optimisation model for scheduling the decommissioning of an offshore wind farm
Irawan, Chandra Ade, (2019)
- More ...
-
Optimisation of maintenance routing and scheduling for offshore wind farms
Irawan, Chandra Ade, (2017)
-
Obal, Thalita Monteiro, (2019)
-
Simulation-based optimisation for stochastic maintenance routing in an offshore wind farm
Irawan, Chandra Ade, (2021)
- More ...