A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system
Year of publication: |
2012
|
---|---|
Authors: | Shabtay, Dvir ; Bensoussan, Yaron ; Kaspi, Moshe |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 136.2012, 1, p. 67-74
|
Publisher: |
Elsevier |
Subject: | Just-in-time scheduling | Flow shop | Controllable processing times | Resource allocation | Pseudo-polynomial time algorithm | FPTAS |
-
Shabtay, Dvir, (2012)
-
Elalouf, Amir, (2013)
-
The just-in-time scheduling problem in a flow-shop scheduling system
Shabtay, Dvir, (2012)
- More ...
-
Shabtay, Dvir, (2012)
-
Shabtay, Dvir, (2012)
-
Maximizing the weighted number of just-in-time jobs in several two-machine scheduling systems
Shabtay, Dvir, (2012)
- More ...