Extent:
1 online resource (159 pages)
Series:
Type of publication: Book / Working Paper
Language: English
Notes:
Description based on publisher supplied metadata and other sources.
Front Cover; Contents; Foreword; Acknowledgments; Abbreviations; Executive Summary; Chapter 1The Status of PPP Frameworks and Portfolios in the EAC; Background; Partner State PPP Frameworks; Figures; Figure 1.1 Kenya's PPP Institutional Framework; Partner State Portfolios; Figure 1.2 Tanzania's PPP Institutional Framework; Figure 1.3 Activity in PPPs, by Country and Sector, 1990-2011; Current Status of Capital Markets; Figure 1.4 Number of PPPs in EAC Countries by Year of Financial Close, 1990-2011; Figure 1.5 East African Yield Curves, December 31, 2011
Figure 1.6 Cumulative Corporate Bond Issues in East AfricaBoxes; Box 1.1 Requirements for Regional Bond Issuance; Existing Capacities and Activities of EAC; Notes; Chapter 2Lessons Learned from Regional Project Case Studies; Summary of Country Case Studies; Key Questions and Lessons in Defining a Role for RECs; Note; Chapter 3Regional PPP Policy Framework Issues; Key Considerations for a Regional PPP Policy; EAC Regional PPP Policy: Key Areas of Priority and Options; Box 3.1 Examples of PPP Definitions Used Around the World; EAC Regional PPP Resource Center: Issues and Options
Box 3.2 International Experience with PPP Focal Points within Regional Economic CommunitiesFigure 3.1 Possible Functions of an EAC PPP Resource Center; PPP Financing: Issues and Options; Box 3.3 Rational for and Design of a Viability Gap Facility; Notes; Chapter 4 Conclusion: Key Elements of a Strategic Business Plan; Key Criteria for a Strategic Business Plan; Box 4.1 Developing a Strategic Business Plan; Establishing Measurable Policy Outcomes; Creation of a Task Force; Budgetary Requirements; Note; Appendix A PPP Country Framework Templates; Burundi; Kenya; Tanzania; Rwanda; Uganda
Appendix BPPP Portfolios in EAC Partner StatesAppendix CRift Valley Railway Case; Introduction; Political Economy Issues; Maps; Map C.1 East African Railway System; Background of the Rift Valley Railways; Figure C.1 Kenya Railways Freight Traffic, 1971-2001; Tables; Table C.1 Kenya Railways: Passenger Market, 1971-2001; Project Preparation; Figure C.2 Kenya-Uganda Railway Concession Structure; Key Regional Aspects of the Joint Concession; Saving the Concession from Collapse (2006-10); Table C.2 Original Project Cost Estimate and Financing Plan; Current Operational Status
Table C.3 Revised Project Cost and Financing PlanBox C.1 The América Latina Logistica (ALL) Company and Its Role; Key Constraints and Challenges; Conclusions and Lessons Learned; Notes; Appendix DJohannesburg to Maputo N4 Toll Road Case; Introduction; Context: The Maputo Corridor; Figure D.1 The N4 Route; Project Preparation; Figure D.2 BROT Project Structure; Box D.1 TRAC's Financiers; Box D.2 Selected TRAC Contracts and Contractors; Box D.3 TRAC Financing Structure; Regional Aspects of the Project; Current Operational Status; Summary of Key Problems and Success Factors
Key Questions in Defining a Role for RECs in Regional PPPs
ISBN: 978-1-4648-0228-7 ; 978-1-4648-0227-0
Source:
ECONIS - Online Catalogue of the ZBW
Persistent link: https://www.econbiz.de/10012690661