Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases
Year of publication: |
2012
|
---|---|
Authors: | Cantarelli, C.C. ; Molin, E.J.E. ; van Wee, B. ; Flyvbjerg, B. |
Published in: |
Transport Policy. - Elsevier, ISSN 0967-070X. - Vol. 22.2012, C, p. 49-56
|
Publisher: |
Elsevier |
Subject: | Cost overruns | Transport | Infrastructure | Project phases | Netherlands |
-
Does infrastructure investment lead to economic growth or economic fragility? : evidence from China
Ansar, Atif, (2016)
-
Infrastructure and inland transport in the Netherlands during the first railway years, 1800 - 1880
Jong, Herman de, (1991)
-
Vervoerprognoses en infrastructuur
Smeenk, Ben, (1989)
- More ...
-
Different cost performance: different determinants?
Cantarelli, C.C., (2012)
-
Cantarelli, Chantal, (2013)
-
Huijts, N.M.A., (2013)
- More ...