Climbing depth-bounded discrepancy search for solving hybrid flow shop problems
Year of publication: |
2007
|
---|---|
Authors: | Hmida, Abir Ben ; Huguet, Marie-José ; Lopez, Pierre ; Haouari, Mohamed |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 1.2007, 2, p. 223-240
|
Subject: | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics |
-
Minimising total weighted earliness and tardiness on parallel machines using a hybrid heuristic
M'Hallah, Rym, (2012)
-
Multi-objective analysis of an integrated supply chain scheduling problem
Cakici, Eray, (2012)
-
Scheduling multiple yard cranes with crane interference and safety distance requirement
Wu, Yong, (2015)
- More ...
-
Discrepancy search for the flexible job shop scheduling problem
Hmida, Abir Ben, (2010)
-
Solving two-stage hybrid flow shop using climbing depth-bounded discrepancy search
Hmida, Abir Ben, (2011)
-
Climbing depth-bounded discrepancy search for solving hybrid flow shop problems
Hmida, Abir Ben, (2007)
- More ...