Closed-loop scheduling and control of waterborne AGVs for energy-efficient Inter Terminal Transport
Year of publication: |
September 2017
|
---|---|
Authors: | Zheng, Huarong ; Negenborn, Rudy R. ; Lodewijks, Gabriel |
Published in: |
Transportation research / E : an international journal. - Amsterdam : Elsevier, ISSN 1366-5545, ZDB-ID 1380969-6. - Vol. 105.2017, p. 261-278
|
Subject: | Closed-loop scheduling and control | Coordinated berthing times | Energy efficiency | Inter terminal transport | Waterborne AGVs | Energieeinsparung | Energy conservation | Scheduling-Verfahren | Scheduling problem |
-
Multi-objective genetic algorithm for energy-efficient job shop scheduling
May, Gökan, (2015)
-
Moon, Joon-yung, (2014)
-
Job scheduling under time-of-use energy tariffs for sustainable manufacturing : a survey
Catanzaro, Daniele, (2021)
- More ...
-
Riessen, Bart van, (2013)
-
Impact and relevance of transit disturbances on planning in intermodal container networks
Riessen, Bart van, (2013)
-
Riessen, Bart van, (2015)
- More ...