CONSIDERATIONS REGARDING THE POLY-SERVICING OF THE WORKPLACES IN THE MACHINE BUILDING INDUSTRY
Year of publication: |
2013
|
---|---|
Authors: | MIREA, Gabriel |
Published in: |
Business Excellence and Management. - Facultatea de Management. - Vol. 3.2013, 4, p. 84-91
|
Publisher: |
Facultatea de Management |
Subject: | Work cycle | Machine tools | Processing operations | Poly-servicing |
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2013)
-
On multi-period emissions trading in the electricity sector
Bode, Sven, (2006)
-
The Efficiency of German Universities Some Evidence from Non-Parametric and Parametric Methods
Kempkes, Gerhard, (2006)
- More ...
-
CONCEPT OF REENGINEERING AGAIN RETURNS IN ACTUALITY
POPESCU, Vasile Ionel, (2014)
-
STATISTICAL CONTROL OF THE PROCESS - SIX SIGMA TECHNIQUE TO IDENTIFY THE PROBLEMS
Mirea, Gabriel, (2015)
-
MIREA, GABRIEL, (2011)
- More ...