Costs to build Fermilab in 1984 dollars
It is of current interest to examine the costs incurred to date to build Fermi National Accelerator Laboratory and to determine what those costs are when stated in FY 1984 constant dollars. The appended tables are in support of this exercise and are based on all costs for Equipment items (reduced by obsolescence) and all Plant Projects which have been appropriated through FY 1984. Also included are non-plant costs which are required to complete the Energy Saver, Tevatron I and II projects (i.e., Equipment and R and D in support of Construction). This study makes the assumption that all funding through FY 1984 will have been costed by the end of FY 1986. Those costs incurred in FY 1985 and FY 1986 have been deflated to FY 1984 dollars. See Appendix A for the DOE inflation factors used in the conversion to FY 1984 dollars. The costs are identified in three categories. The Accelerator Facilities include all accelerator components, the buildings which enclose them and utilities which support them. The Experimental Facilities include all beam lines, enclosures, utilities and experimental equipment which are usable in current experimental programs. The Support Facilities include lab and office space, shops, assembly facilities, roads, grounds and the utilities which do not specifically support the Accelerator or Experimental Facilities, etc.
Year of publication: |
2009-04-02
|
---|---|
Authors: | Jordan, N.G. ; Livdahl, P.V. |
Subject: | particle accelerators | FERMILAB ACCELERATOR | COST | ACCELERATOR FACILITIES | ACCELERATORS | CYCLIC ACCELERATORS | SYNCHROTRONS |
Saved in:
freely available
Saved in favorites
Similar items by subject
-
Bodnarczuk, M., (2009)
-
Harding, D.J., (2009)
-
CORBA Evaluations for the BABAR Online System
Glanzman, Thomas, (2008)
- More ...