Critical-path-search logic-based Benders decomposition approaches for flexible job shop scheduling
Year of publication: |
2022
|
---|---|
Authors: | Naderi, Bahman ; Roshanaei, Vahid |
Published in: |
INFORMS journal on optimization. - Catonsville, Md. : INFORMS, ISSN 2575-1492, ZDB-ID 2957493-6. - Vol. 4.2022, 1, p. 1-28
|
Subject: | combinatorial optimization | logic-based Benders decomposition | hybrid MIP/CP | flexible job shop | critical path | analytics | Scheduling-Verfahren | Scheduling problem | Dekompositionsverfahren | Decomposition method | Mathematische Optimierung | Mathematical programming | Operations Research | Operations research | Flexibles Fertigungssystem | Flexible manufacturing system |
-
Benders' decomposition for the balancing of assembly lines with stochastic demand
Sikora, Celso, (2021)
-
A decomposition based solution algorithm for u-type assembly line balancing with interval data
Hazır, Öncü, (2015)
-
Combinatorial Benders cuts for assembly line balancing problems with setups
Akpinar, Sener, (2017)
- More ...
-
Naderi, Bahman, (2021)
-
Roshanaei, Vahid, (2021)
-
Naderi, Bahman, (2020)
- More ...