Cycle time analysis in reentrant robotic cells with swap ability
Year of publication: |
2012
|
---|---|
Authors: | Foumani, Mehdi ; Jenab, Kouroush |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 22 (15.11.), p. 6372-6387
|
Subject: | robotic cells | sequencing | Roboter | Robot | Fertigungsinsel | Cellular manufacturing | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem |
-
Sequencing and scheduling in a three-machine robotic cell
Zahrouni, Wassim, (2012)
-
Scheduling in robotic cells with time window constraints
Zahrouni, Wassim, (2021)
-
Throughput optimization in circular dual-gripper robotic cells
Jung, Kyung Sung, (2018)
- More ...
-
Analysis of flexible robotic cells with improved pure cycle
Foumani, Mehdi, (2013)
-
Cycle time analysis in reentrant robotic cells with swap ability
Foumani, Mehdi, (2012)
-
Scheduling rotationally arranged robotic cells served by a multi-functional robot
Foumani, Mehdi, (2014)
- More ...