Cycle time estimation of a multiple product production line: an approach with fuzzy and chance-constrained programming
Year of publication: |
2009
|
---|---|
Authors: | Xu, Min ; Abdul-Kader, Walid ; Ganjavi, Ozhand |
Published in: |
INFOR : information systems and operational research. - Ottawa : INFOR Journal, ISSN 0315-5986, ZDB-ID 121260-6. - Vol. 47.2009, 2, p. 93-103
|
Subject: | Durchlaufzeit | Lead time | Fuzzy-Set-Theorie | Fuzzy sets | Mathematische Optimierung | Mathematical programming | USA | United States | Theorie | Theory |
-
Complexity of the two-stage no-wait assembly problem with setup and removal times separated
Strusevič, Vitalij Aleksandrovič, (1991)
-
Fluid model criterion for instability of re-entrant line with infinite supply work
Guo, Yongjiang, (2009)
-
Xingye, Dong, (2013)
- More ...
-
A nonlinear model for optimizing the performance of a multi-product production line
Abdul-Kader, Walid, (2011)
-
An integrated model for optimisation of production and quality costs
Abdul-Kader, Walid, (2010)
-
An integrated model for optimisation of production and quality costs
Abdul-Kader, Walid, (2010)
- More ...