Cyclic scheduling of parts and robot moves in m-machine robotic cells
Year of publication: |
February 2018
|
---|---|
Authors: | Gultekin, Hakan ; Coban, Betul ; Akhlaghi, Vahid Eghbal |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 90.2018, p. 161-172
|
Subject: | Robotic cell scheduling | Multiple parts | Mixed integer linear programming formulation | Hybrid metaheuristic | Throughput maximization | Roboter | Robot | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Fließfertigung | Assembly-line production | Mathematische Optimierung | Mathematical programming | Fertigungsinsel | Cellular manufacturing | Durchlaufzeit | Lead time |
-
Cycle time analysis in reentrant robotic cells with swap ability
Foumani, Mehdi, (2012)
-
Multi-degree cyclic flow shop robotic cell scheduling problem : ant colony optimization
Elmi, Atabak, (2016)
-
A review of recent theoretical development in scheduling dual-gripper robotic cells
Sriskandarajah, Chelliah, (2018)
- More ...
-
Fuel distribution planning for disasters : models and case study for Puerto Rico
Akhlaghi, Vahid Eghbal, (2021)
-
The two-echelon island fuel distribution problem
Akhlaghi, Vahid Eghbal, (2022)
-
Gultekin, Hakan, (2012)
- More ...