Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor Backend facility
Year of publication: |
2009
|
---|---|
Authors: | Weigert, G. ; Klemmt, A. ; Horn, S. |
Published in: |
International journal of production research : American Institute of Industrial Engineers ; Society of Manufacturing Engineers. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 1604776. - Vol. 47.2009, 8, p. 2165-2184
|
Saved in:
Saved in favorites
Similar items by person
-
Weigert, Gerald, (2009)
-
Optimization of manufacturing processes by distributed simulation
Weigert, G., (2006)
-
Modelling and optimisation of assembly processes
Weigert, G., (2011)
- More ...