Erratum to: "Lot size effects on process lead time, lead time demand, and safety stock": [International Journal of Production Economics 100 (2006) 1-9]
Year of publication: |
2006
|
---|---|
Authors: | Vaughan, T.S. |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 103.2006, 2, p. 896-896
|
Publisher: |
Elsevier |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Erratum to: “Lot size effects on process lead time, lead time demand, and safety stock”
Vaughan, T.S., (2006)
-
A model of the perishable inventory system with reference to consumer-realized product expiration
Vaughan, T.S., (1994)
-
Variables Inspection for SPC-Quarantined Production
Vaughan, T.S., (2001)
- More ...