Evaluation of economic rent of hydropower projects
Existing studies have mostly estimated the ex post economic rent of hydropower for the hydroelectric system of a province or a country as a whole and have ignored the site- or project-specific variations in the economic rent of hydropower plants. Further, most of the existing studies have used simplified methods to calculate the rent ex post. This paper presents a rigorous methodology for estimation of site-specific (i.e., project specific) economic rent of hydropower ex ante. It applies the methodology in the case of a hydropower project and analyzes the sensitivity of the rent to variations in some key parameters.
Year of publication: |
2009
|
---|---|
Authors: | Shrestha, Ram M. ; Abeygunawardana, A.M.A.K. |
Published in: |
Energy Policy. - Elsevier, ISSN 0301-4215. - Vol. 37.2009, 5, p. 1886-1897
|
Publisher: |
Elsevier |
Keywords: | Economic rent of hydropower Ex ante project-specific hydropower rent Rigorous method for hydropower rent estimation |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Shrestha, Ram M., (2007)
-
Evaluation of economic rent of hydropower projects
Shrestha, Ram M., (2009)
-
Shrestha, Ram M., (2007)
- More ...