Exact and heuristic methods to solve the parallel machine scheduling problem with multi-processor tasks
Year of publication: |
July 2018
|
---|---|
Authors: | Wu, Lingxiao ; Wang, Shuaian |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 201.2018, p. 26-40
|
Subject: | Scheduling | Parallel machine | Multi-processor tasks | Branch and bound | Tabu search | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Branch-and-Bound | Branch and Bound | Theorie | Theory | Produktionssteuerung | Production control |
-
Scheduling to minimize the maximum total completion time per machine
Wan, Long, (2015)
-
Muñoz-Díaz, María-Luisa, (2024)
-
Ozturk, Onur, (2017)
- More ...
-
Wu, Lingxiao, (2020)
-
Optimal re-allocation of mooring areas for yachts
Wang, Shuaian, (2019)
-
Yang, Dong, (2019)
- More ...